Cable Cottage calling the French

How a  cottage on the beach at Salcombe started life as  part of the  jigsaw of Victorian global submarine   communications.

 

Check out Cable Cottage

Take a stroll  from the heart of Salcombe, and following the coastline,  you reach North Sands  Beach. It’s a  pretty  little sandy cove, with the  beach tumbling away from “The Winking Prawn”  restaurant.  And just  down the road from this  pretty little restaurant is Cable Cottage.

Cable Cottage has a  great story to tell.

These days  guests can holiday  at the cottage  and enjoy  modern comforts.  But not many people appreciate the huge part this cottage   played in the  advancement of our global communications.  And the complexity  of the  global communication cables that sit under the sea.

 

Early years of messaging under the Sea

Submarine communication cables were developed   in the 1840s  as a  means of sending  messages across the seas –  transatlantic, or maybe just into Europe.

Telegrams were just emerging,   thanks to   Morse and Wheatstone, who revolutionised land based communications  .  And now this  next stage required great engineering skill to send messages across the water.  More specifically – under the sea .   Before  1840,  the fastest way to send a message across the Atlantic to America was by steamship.  After 10 – 12 days, your message would be delivered..

 

Early success sending messages under water from Dover to Calais.

Well  copper wires  carried the messages and these were wrapped in a natural latex called gutta percha.  Messaging cables were first tested in short stretches , crossing rivers and short stretches of water in the 1840s.

Following good initial success, developers  got bolder. And  in 1850  made the first attempt to lay a submarine telegraph cable between Dover and Calais.   This  communication worked, but only for 24 hours, failing since it wasn’t adequately protected.

It didn’t take long for success to follow, however; a stronger, more armoured cable was  used, which was  better protected by layers of hemp and wire.  This was to become  the worlds first permanent international  submarine cable.  And the year was 1851.  The next challenge was to lay a cable  across the Atlantic.

 

Calling America

Enter Cyrus West Field, who founded the Atlantic Telegraph Company in 1856.  A bigger cable was constructed – 7 copper wires were put together, wrapped in gutta-percha, covered with a tarred hemp and multiple strands of iron wire. It was planned to  run from the Irish coast to Heart’s Content in Newfoundland –  some 2500 miles.

Amazing to think that the sheer weight of each mile of this cable was 1  tonne.  With the lack of sonar and GPS, cable layers relied  upon navigational charts for direction and depth –  with two ships  setting off and essentially  meeting mid Atlantic to  lay the cables up to 3000 metres deep and then splice the cable together.

It worked !!   But  not for long.

Queen Victoria sent the first official  telegraph to US President  James Buchanan  on 16 August, 1858.   A rousing success!  But three weeks later the cable failed.  It was a learning curve; poor insulation and too  much electrical voltage  had burnt out conduction.

Just seven years later, Isambard Kingdom Brunel’s steamship, SS Great Eastern,  came into her own  –  and carried the entire  length of cable that would cross the Atlantic.  It amassed to thousands of tonnes of cable. Now there would be no need for a join. The cable was transported in tanks of water to keep the insulation flexible.   And it was rolled out off the ship  under constant tension along the Atlantic sea floor.

During her first attempt to lay the cable in 1865, the cable snapped in deep water.

A year later the cable was successfully laid. And as a bonus, engineers managed to recover the previously lost cable and  reuse that one to completion.  Two  cables were then running across the Atlantic.  Small boats had been used to secure the line on the shoreline. Once hauled onto land, the cable was connected to a telegraph station.

Telegraph  transmission time had reduced from 10 days to a few minutes.

 

Linking Salcombe up

Within  Britain ,  a  land based network  of  telegraph lines spread out, even with lines extending between Totnes  and  Kingsbridge , linking receiving stations. At Prawle, newspaper  owner, Mr G.P.Friend, was able to receive early messages of news for his paper, the “Shipping Gazette” by these links.  Spider like links on the South West  map  linked neighbouring areas like Frogmore , and Salcombe. Post Offices   like Kingsbridge and Torcross became  receiving offices for messages.

Cable Cottage in Salcombe  was one such telegraph station when her route was  engineered.

 

And so to  Cable Cottage

Cable Cottage enters the story in 1870. It was built on the edge of Salcombe’s North Sands Beach as one of the  landing stations  for a cable to link Britain with France – the Brest-Salcombe cable, which spanned a distance of 101 miles.  From here the cable could be  monitored, relays could boost the signals and the operators  could live on site.

The Salcombe link  was a significant landing point and meant that now   messages could be fired off to and from  London   or Paris   and then eventually on to cross the Atlantic.

To accomplish the laying  of the Salcombe cable, a steamer ship ,the William Cory, arrived  off Salcombe on 27 May 1870, with the  shore end of the cable , selecting a   landing  point   on the beach just under Bolt Head.  The cable was taken 250 yds to the cliff top, to a temporary testing house, before   relocating into a more permanent building.

A different ship, the Anglo –  American “ Robert Lowe” was the one that subsequently helped raise the shoreline end of the cable so it could make a fresh splice to Cable Cottage on 15 October, 1871.

Operators in the Cottage  had to monitor the cable for continuity and insulation of the submerged portions.  This  important link connected Britain to Brest, in France . And then   from Brest came the link  to Cape Cod, USA

Such great things followed –  within 40 years ,  there were over 100 submarine cables linking the continents.  And just fifty years later the first transatlantic telephone service started.

Now a  days, hundreds of fibreoptic cables   carry 99% of the world’s internet traffic .  So valuable is this communication resource, that it requires constant  protection from damage and sabotage, by alien forces.

 

Now a holiday home

The Salcombe Cable became defunct in 1900, when it was replaced by a different cable across the channel.  And Cable Cottage was converted to residential use.

Today Cable Cottage is a popular holiday  rental property and worth a discovery.  From its historical start as a submarine cable  landing point, it was substantially renovated.  It spent a short time as a café, before becoming residential. There remain several features that hint of the past – like   the arched windows and wooden mullions.

And this pretty little Cottage quietly still tells a great story of global  communications  in Victorian times .

 

 

 

Leave a Reply